Tuesday, March 23, 2010

Controlled Progress

I've been able to use some lunch breaks to progress the control panel a little further. All the LEDs on the main circuit are now wired up - red or green on the main section to indicate whether the red or green controller is in use.



Inside the box the circuit board has been mounted that will contain the CDU (for powering the point motors). I've also fitted a relay (yet to be wired up) which I've finally decided I need to get the platform lines working how I want them.


The reverse of the control panel is slowly turning into a nest of wires. Only about 1/4 of the wires have been fitted so far!


No comments:

Post a Comment